The DIM company performs work at the construction site on the street. Olehivska, 36.

In May, the following works were performed at the construction site:

Section 1:

  • Reinforcement of concreting of vertical structures up to -0.000 - 95%

Section 2:

  • Reinforcement of concreting of the 3rd floor and structures - 35%

Section 3:

  • Reinforcement of concreting of the 3rd floor and structures - 35%

Section 4:

  • Reinforcement of concreting of vertical structures of the 2nd floor - 55%

Section 5:

  • Reinforcement of concreting of vertical structures of the lower part of the section - 25%

Stay tuned