The DIM company performs work at the construction site on the street. Olehivska, 36.
In May, the following works were performed at the construction site:
Section 1:
- Reinforcement of concreting of vertical structures up to -0.000 - 95%
Section 2:
- Reinforcement of concreting of the 3rd floor and structures - 35%
Section 3:
- Reinforcement of concreting of the 3rd floor and structures - 35%
Section 4:
- Reinforcement of concreting of vertical structures of the 2nd floor - 55%
Section 5:
- Reinforcement of concreting of vertical structures of the lower part of the section - 25%